e And Engineering, 2006, 1(2): 36–41. (in Chinese))
[10] 陳 龍, 黃宏偉. 上中路隧道工程風險管理的實踐[J]. 地下空間與工程學報, 2006, 1(2): 65–69. (CHEN Long,HUANG Hong-wei. The practice of risk management inshangzhong road tunnel engineering[J]. Chinese Journam ofUnderground Space and Engineering, 2006, 1(2): 65–69. (inChinese))
[11] 陳 龍, 黃宏偉, 范益群. 工程項目風險分析若干問題淺議[J]. 地質(zhì)與勘探, 2003(S): 360–365. (CHEN Long,HUANG Hong-wei, FAN Yi-qun. The discussion about somequestions of engineering analysis[J]. Geology andProspecting, 2003(S): 360–365. (in Chinese))
[12] 郭仲偉. 風險分析與決策[M]. 北京: 機械工業(yè)出版社,1986. (GUO Zhong-wei. Risk analysis and decision[M].Beijing: China Machine Press, 1996. (in Chinese))